Quick Answer: A tankless water heater installation runs 2–4 hours for a tankless-to-tankless swap, 6–10 hours when converting from a storage tank, and 2–3 days if it also needs a gas line upgrade, new venting, or an electrical panel upgrade, per installation-time data compiled by residential plumbing contractors. Almost every jurisdiction requires a permit — and per the International Code Council’s model codes, a 199,000 BTU/h gas unit in a single-family home falls under the residential (IRC) code path, while the same unit in a mixed-use commercial building follows the separate IPC/IFGC commercial path with its own inspection requirements. A plug-in electric point-of-use unit is a realistic DIY project; a whole-home gas conversion generally isn’t, both because of code and because most manufacturers require a licensed contractor’s gas and electrical hookup to preserve the warranty.

Every buying guide on this site talks about which heater to buy. This one covers what happens after the box shows up — the real timeline, the permit and inspection steps people skip at their own risk, and an honest read on which parts of the job are DIY-reasonable versus which parts you’re better off not touching yourself.

The real installation timeline

ScenarioTypical timeWhy
Tankless-to-tankless swap2–4 hoursVenting, gas line, and mounting point already exist and fit
Tank-to-tankless conversion6–10 hoursNew venting run, often a gas line upsize, new wall mounting
Complex conversion (gas line upgrade + electrical + venting reroute)2–3 daysMultiple trades, multiple inspections
Electric point-of-use swapUnder 1 hourPlugs into an existing outlet, no venting

The number that matters isn’t “how long does the heater take to bolt to the wall” — it’s how much of your existing infrastructure has to change to support it. A straight tankless-to-tankless replacement is a half-day job. A first-time conversion from a tank is a full workday, and if the gas line, electrical service, or venting path needs real work, it stretches into a multi-day project with its own permit and inspection for each trade involved.

What actually happens during the install

  1. Load calculation and sizing. Before anything gets mounted, the flow rate and BTU requirement get calculated against your fixture count and groundwater temperature — see our tankless water heater sizing guide for the GPM × 500 × temperature-rise formula. Getting this wrong means a heater that runs out of hot water at two showers running at once.
  2. Shutoff and removal of the old unit. Water, gas (or electrical), and any existing venting get disconnected and the old tank or unit comes out.
  3. Mounting. Tankless units mount to a wall bracket, indoors or outdoors depending on the model and climate — a different footprint than a floor-standing tank, so the mounting location often shifts.
  4. Gas or electrical hookup. Gas units may need the line upsized — see our tankless water heater gas line size guide for how BTU rating and run length set the actual pipe diameter — while electric units need a load calc against panel capacity, sometimes triggering a service upgrade. Both are the parts of the job most manufacturers want a licensed contractor handling.
  5. Venting (gas units only). Condensing and non-condensing units use entirely different vent materials and length limits — our tankless water heater venting guide covers the PVC-vs-stainless-steel rule and the equivalent-length math inspectors check.
  6. Isolation valves and commissioning. Valves get installed on the inlet and outlet, the system gets purged of air, and the unit gets fired up and checked for leaks and correct temperature rise before the installer leaves.

Permits and inspections

Permit typeTriggered byWhat it covers
MechanicalAny water heater installationBaseline permit almost every jurisdiction requires
PlumbingNew water line routing, isolation valvesRough-in and final plumbing inspection
GasNew or upsized gas lineGas-specific inspection, separate from plumbing
ElectricalNew circuit, panel upgrade, or electric unit installNEC-governed inspection, separate from mechanical

Per the International Code Council’s model codes, the residential-vs-commercial code path is drawn largely by BTU input and occupancy: a 199,000 BTU/h gas tankless unit in a single-family home follows the IRC (International Residential Code), while the same unit in a mixed-use commercial structure follows the separate IPC/IFGC commercial path — different inspectors, different checklist. Installing for a restaurant, salon, or multifamily building rather than a house? Our best commercial tankless water heater guide covers the cascade-ready, Commercial ENERGY STAR-certified units built for that code path and duty cycle. Most tankless jobs stack more than one permit type at once (mechanical plus gas, or mechanical plus electrical), and each trade typically gets its own inspection rather than one combined sign-off. Skipping the permit to save time is the most common way an otherwise-correct DIY install turns into a problem — either at resale, when an inspector flags unpermitted gas or electrical work, or with your manufacturer, since several tankless warranties are contingent on a code-compliant, permitted installation. The plumbing inspector will also check for a thermal expansion tank if your cold supply has a check valve, PRV, or backflow preventer on it — see our tankless expansion tank guide to confirm whether that applies to your install before the inspection, not during it. On a condensing unit, the inspector may also want to see the condensate line routed to a code-compliant drain — our condensate drain guide covers when a neutralizer is required and what to do if there’s no floor drain nearby. If the unit is going over finished space, in a closet above a bedroom, or in an attic, the inspector may also require a drain pan under it — most garage and basement installs are exempt, but our best tankless water heater drain pan guide covers when the requirement kicks in and which pan fits.

DIY vs. hire a pro

Rheem RTG20326 Isolation Valve Kit

Best OEM isolation valve kit · brass hot/cold ball valves · pressure relief valve included · fits RTGH-84/90/95 and other Rheem tankless models
  • The manufacturer-matched isolation valve set for Rheem tankless units — install it at the same time as the heater rather than retrofitting it after the fact.
  • Full-port brass ball valves let a descaling pump circulate vinegar through the heat exchanger without disconnecting the water lines, turning an annual maintenance job into something you can do yourself in under an hour. (Rheem's separate RTG20124 is a flush kit — pump, bucket, and hoses for that annual descale — not an isolation valve kit; see our descaling guide for that one.)
  • The pressure relief valve included in this kit is a built-in part of the cold-side body, not something you buy separately once this kit is installed — see our pressure relief valve guide if you're troubleshooting whether your install has one.
  • Skipping isolation valves at install time is the single most common regret homeowners report once their first descaling is due.
Check price on Amazon →

Get your tankless heater and fittings in two days — try Amazon Prime free for 30 days.

2. EASTMAN Full-Port Isolation Valve Kit — Best Universal/Budget Pick

EASTMAN Full-Port Tankless Water Heater Isolation Valve Kit

Best budget/universal option · full-port ball valves · pressure relief valve · fits most 3/4-inch tankless connections
  • Not brand-locked to a single manufacturer, unlike the OEM Rheem kit above — a straightforward pick if you're installing a Rinnai, Navien, Noritz, or Takagi unit and don't need a brand-matched kit.
  • Same full-port design that lets a maintenance pump push descaling solution through the unit without breaking the plumbing connections.
  • Confirm your unit's inlet/outlet size before ordering — most residential tankless units use 3/4-inch connections, but check your specific model's installation manual.
Check price on Amazon →

3. BrassCraft ProCoat Stainless Steel Gas Connector — Best for Gas Hookup

BrassCraft ProCoat Stainless Steel Gas Connector

Best for gas line hookup · coated stainless steel flexible connector · code-compliant for gas appliance connections
  • The flexible connector between a rigid gas line and the heater itself — sized to match your unit's gas inlet, not the branch line diameter, so confirm both before ordering.
  • A flexible connector isn't a substitute for upsizing an undersized branch line — if your existing 1/2-inch line can't flow enough gas for a 160,000+ BTU unit, the fix is a larger line, not a different connector, and that's plumber-or-gas-fitter work in nearly every jurisdiction.
  • Buy this alongside your unit rather than assuming the old tank's connector will fit — tankless units commonly sit in a different location with a different connection point than the tank they're replacing.
Check price on Amazon →

4. SharkBite Tankless Water Heater Installation Kit — Best for Water Line Hookup

SharkBite Tankless Water Heater Installation Kit

Best for water line hookup · push-to-connect fittings · works on PEX, copper, and CPVC without soldering
  • Push-to-connect fittings let a DIYer make the water-line connections to a new wall-mounted unit without a torch or solder — useful on the plumbing side even on jobs where the gas or electrical hookup goes to a licensed pro.
  • Compatible across PEX, copper, and CPVC, which matters when a tankless conversion moves the connection point and you're tying into whatever pipe material is already in the wall.
  • Pairs with the isolation valve kits above — install both in the same work session rather than as separate trips.
Check price on Amazon →

How to choose

The bottom line

Tankless water heater installation isn’t one job — it’s several, and which ones apply to you depends entirely on what you’re replacing. A tankless-to-tankless swap runs 2–4 hours; a tank conversion runs 6–10 hours; a job that also needs a gas line upgrade, new venting, or electrical service can run 2–3 days. Almost every jurisdiction requires a permit, and per the International Code Council’s model codes, even the BTU rating of your unit can determine which code path — residential IRC or commercial IPC/IFGC — governs the inspection. Electric point-of-use units are a realistic DIY project; whole-home gas conversions generally aren’t, both for code reasons and because most manufacturers tie their warranty to a licensed, permitted installation. Install isolation valves at the same time as the heater regardless of who does the work — it’s the cheapest insurance against an expensive first descaling. Once it’s running, our temperature setting guide covers the setpoint to dial it in to before anyone showers. Before you get that far, though, confirm the mounting spot itself works — our tankless water heater dimensions guide covers real unit sizes plus the front service clearance manufacturers actually require.

Shop tankless water heater installation kits on Amazon →